With all of the paint work done from the rub rail up, it’s time to get rid of the second story scaffolding at the deck level.
It’s a lot easier to longboard the hull with the scaffolding uprights and overhead beams out of the way.
Lots of things are going on nearly simultaneously now in preparation for spraying “the shiny” on the hull.
Next up on our 1969 Chris Craft Roamer 46 Refit: Exhaust II




